The Making of a Dam ... Main Dam
 

The Bakun dam is 207 metres high with an approximate crest length of 748 metres and a fill volume of 117 million cubic metres.

The face of this Concrete Face Rock fill Dam is essentially a slab of concrete placed against rockfill on the upstream slope that extends from the dam crest to the plinth.

Excavation of earth and soil was carried out before the plinth is constructed from concrete.

     
Upstream and westward views of Concrete Face and Main Dam 2007
     
Upstream views of Power Intake area 2007
     
Upstream view of Spillway 2007
     
Views of Concrete Face 2006-2005
     
Views of Concrete Face 2004
     
First Rocks officiated by Tan Sri Dato’ Dr. Ahmad Sarji
Chairman, Sime Darby Group 2003
     
 
 